PERMIT FEES

The Engineering Division issues permits for various activities.  The permit provides for City approval of the activity, inspection funding, fiinancial security, limitation of City liability and identifies the limits of the activity and time frame.

The City requires permits for the following activity:

To obtain a permit, you must: 

  • Have City approval of the proposed activity.
  • Submit the completed Permit Application to the Engineering Division.
  • Provide required permit documentation (see permit application).
    • Documentation may included traffic control plans, proof of license and insurance,
  • Pay Permit Fees.
  • Post security as required.

 

PERMIT FEES

GRADING: Locate cubic yards (total of Cut and Fill) range below; calculate fee due by following the formula provided under “Formula”; add administration fee for Total Due.

            DESCRIPTION          

 FEE CALCULATION FORMULA

 100 Cubic Yards or Less:  $220.00 *
 101 – 1,000 Cubic Yards  $220.00 for the first 100 cubic yards, plus $50.00 for each additional 100 cubic yards or fraction thereof.*
 1,001 – 10,000 Cubic Yards:  $670.00 for the first 1,000 cubic yards, plus $50.00 for each additional 1,000 cubic yards or fraction thereof.*
 10,001 – 100,000 Cubic Yards:  $1,120.00 for the first 10,000 cubic yards, plus $190.00 for each additional 10,000 cubic yards or fraction thereof.*
 100,001 – 400,000 Cubic Yards:  $2,830.00 for the first 10,000 cubic yards, plus $110.00 for each additional 100,000 cubic yards or fraction thereof.*

 Over 400,000 Cubic Yards:  

 $6,130.00 for the first 400,000 cubic yards, plus $110.00 for each additional 100,000 cubic yards or fraction thereof.*

ADD: Administration Charge: $200.00 

 

ENCROACHMENT:Locate cubic yards (total of Cut and Fill) range below; calculate fee due by following the formula provided under “Formula”; add administration fee for Total Due

ENCROACHMENT - SUBDIVISIONS/COMMERCIAL IMPROVEMENTS DESCRIPTION:

ENCROACHMENT PERMIT BASED ON ENGINEER'S ESTIMATE

FORMULA FOR FEE CALCULATION *

 $0-$50,000

 6.5%

 $50,000 - $300,000

 5.5%

 $300,000 - $700,000

 5.0%

 $700,000 - $1,000,000

 4.5%

 $1,000,000 AND UP

 4.0%

* ADD Administration Charge: $100.00

ENCROACHMENT - APPLY TO NON-SUBDIVISION, SINGLE FAMILY
RESIDENTIAL

ENCROACHMENT PERMIT 
(activity description)

FEE *

 Driveway - Residential  $110
 Driveway – Commercial  $110
 Catch Basins  $110
 Curb & Gutter  $110 + $.70 / linear foot
 Sidewalk  $110 + $.70 / linear foot
Paving $110 + $.70 / linear foot
One time Inspection $110
Road Closure Permit $110

 * ADD Administration Charge: $100.00




TRANSPORTATION PERMIT: rate is established by the State of California 
Department of Transportation

DESCRIPTION   FEE
 Annual      $90
 Per Trip  $16

 

 

 

UTILITY PERMITS: Locate applicable construction activity under “Description” – more than one may apply; calculate fee due by multiplying by fee shown in “Fees” column; add administration charge for Total Due.

 DESCRIPTION FEES * 
 Trench - less than 200 linear feet      $325 + $.55 per linear foot
 Trench - 200 - 1000 linear feet  $550 + $.45 per linear foot
 Trench - Over 1000 linear feet  $675 + $.35 per linear foot
 One time inspection - i.e. potholes, bellholes, spllice pits, etc.  $120
 Driveway - Residential  $110
 Driveway – Commercial       $110/each
 Catch Basins $110/each
 Curb & Gutter $110 + $.70/per linear foot
 Sidewalk $110 + $.70 / linear foot
 Paving $110 + $.75 / linear foot
 One Time Inspection - i.e. traffic control set up, etc. $110
 Road Closure Permit $110

ADD Administration Charge – On ALL Encroachment Permits * $100.00