Lakeside Residential Project

Print

NOTICE OF PUBLIC HEARING AND NOTICE OF AVAILABILITY AND INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION

NOTICE IS HEREBY GIVEN that the Planning Commission of the City of Lake Elsinore, California, will hold a Public Hearing on January 18, 2022 at the Lake Elsinore Cultural Center, 183 North Main Street, Lake Elsinore, California, 92530, at 6:00 p.m., or as soon thereafter as the matter may be heard, to consider the Draft Mitigated Negative Declaration and the proposed project, as described below.

ALL INTERESTED PERSONS are hereby invited to attend this Public Hearing to present written information, express opinions or otherwise present evidence in the above matter. If you wish to legally challenge any action taken by the City on the above matter, you may be limited to raising only those issues you or someone else at the Public Hearing described in this notice, or in written correspondence delivered to the City prior to or at the Public Hearing.

A Draft Initial Study/Mitigated Negative Declaration (IS/MND; Environmental Review No. 2021-02) has been prepared pursuant to the California Environmental Quality Act (CEQA) for the Lakeside Residential Project (Planning Application No. 2021-11, Zone Change No. 2021-04 (Planned Unit Development (PUD) Overlay), Tentative Tract Map No. 38116, Residential Design Review No. 2021-02) and is available for public review

Public Review Period

The City Lake Elsinore is the Lead Agency under CEQA for this project and is holding a 30-day public review period on the Draft IS/MND beginning on Friday, November 19, 2021, and ending on Monday, December 20, 2021, during which time responsible agencies, the public, and interested parties are invited to comment on the IS/MND for the proposed project.

Notice of Availability and Intent to Adopt

Draft Initial Study

Appendix A -Air Quality Impact Analysis
Appendix B – Biological Technical Report
Appendix C –Cultural Resources Study
Appendix D - Energy Analysis
Appendix E – Geotechnical and Fault Evaluation|
Appendix F - Paleontological Assessment
Appendix G – Greenhouse Gas Analysis
Appendix H – Phase I Environmental Site Assessment
Appendix I - Preliminary Hydrology Report
Appendix J - Project Specific Water Quality Management Plan
Appendix K - Noise Impact Analysis
Appendix L – Traffic Impact Analysis
Appendix M – VMT Analysis Memorandum

Written comments and any questions regarding the project should be directed to:

 Damaris Abraham, Senior Planner
Community Development Department
City of Lake Elsinore
130 South Main Street
Lake Elsinore, CA 92530
951-674-3124 Ext. 913
dabraham@lake-elsinore.org